Connection of a temporary generator directly into the main switchboard (not designed for this purpose)
Replacement of the site’s only generator without IT outage
TIER 2 DATACENTER – FRANCE





Connection of a temporary generator directly into the main switchboard (not designed for this purpose)
Replacement of the site’s only generator without IT outage
TIER 2 DATACENTER – FRANCE